Wednesday, February 6th – Tuesday, February 12th
On Friday, February 8th, we officially reached the 6 month mark. Considering we were told the entire process would take 6-7 months at most, I think it’s safe to assume we’ll finish closer to 7 months, if not longer.
The carpenter continued cutting and hanging pieces of trim and it looks as though the main stairway and railings are all he has left to finish. Once completed it’ll be time for the painters to come in and do their thing.
The electrician also came in and started installing our light fixtures. It was exciting to see what we had picked out several months ago finally on display.
On the downside, we are still waiting for the wall that came down in the powder room to be fixed. Because the door was moved 6″-8″ over we asked that they move the light switch over as well. As you can see from the picture below, it’s still in its original spot.
We also started seeing some fairly large cracks in the drywall. We’re assuming this happened because they had the heat set to 90 when they were hanging and mudding it, and then back down to 50-60 a few weeks later. It could also be that they did a shitty job. Who knows. Our hope is that they fix it when they come to redo the powder room wall but that might be asking a lot at this point.
I’d also like to give a special shout-out to my second reader/picture viewer, Konstantin! Welcome 👋 And I apologize in advance.
- Garage doors finally installed
- More finished carpentry work
- Final electrical work started
- Caulking and prepping for final paint

Day 183 

Yay! Garage doors! 
Boo! There’s a dent. 
Day 184 
Floor and window trim 
Cabinet trim 
More floor trim 
A railing 
A bench and still more trim 
And whatever that thing on the left is 
Day 186 

Office 
Living room 

Guest bathroom 
Laundry room 
Loft 
Guest room 1 
Guest room 2 
Master bathroom 
Day 188 


Day 189 
Powder room wall is still MIA 
Sizable drywall crack
27 weeks down, 2 to go.
2 weeks to go! LOL Now we all know that ☝️ain’t gonna happen.
